Saturday, October 29, 2022

 

Environmental impact assessment, EMS

Environmental assessment (EA) is the assessment of the environmental consequences (positive and negative) of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action. In this context, the term "environmental impact assessment" (EIA) is usually used when applied to actual projects by individuals or companies and the term "strategic environmental assessment" (SEA) applies to policies, plans and programmes most often proposed by organs of state. Environmental assessments may be governed by rules of administrative procedure regarding public participation and documentation of decision making, and may be subject to judicial review.

The purpose of the assessment is to ensure that decision makers consider the environmental impacts when deciding whether or not to proceed with a project. The International Association for Impact Assessment (IAIA) defines an environmental impact assessment as "the process of identifying, predicting, evaluating and mitigating the biophysical, social, and other relevant effects of development proposals prior to major decisions being taken and commitments made". EIAs are unique in that they do not require adherence to a predetermined environmental outcome, but rather they require decision makers to account for environmental values in their decisions and to justify those decisions in light of detailed environmental studies and public comments on the potential environmental impacts

Environmental impact assessments commenced in the 1960s, as part of increasing environmental awareness. EIAs involved a technical evaluation intended to contribute to more objective decision making. In the United States, environmental impact assessments obtained formal status in 1969, with enactment of the National Environmental Policy Act. EIAs have been used increasingly around the world. The number of "Environmental Assessments" filed every year "has vastly overtaken the number of more rigorous Environmental Impact Statements (EIS)." An Environmental Assessment is a "mini-EIS designed to provide sufficient information to allow the agency to decide whether the preparation of a full-blown Environmental Impact Statement (EIS) is necessary." EIA is an activity that is done to find out the impact that would be done before development will occur.

General and industry specific assessment methods are available including:

·         Industrial products – Product environmental life cycle analysis (LCA) is used for identifying and measuring the impact of industrial products on the environment. These EIAs consider activities related to extraction of raw materials, ancillary materials, equipment; production, use, disposal and ancillary equipment.

·         Genetically modified plants – Specific methods available to perform EIAs of genetically modified organisms include GMP-RAM and INOVA.

·         Fuzzy logic – EIA methods need measurement data to estimate values of impact indicators. However, many of the environment impacts cannot be quantified, e.g. landscape quality, lifestyle quality and social acceptance. Instead information from similar EIAs, expert judgment and community sentiment are employed. Approximate reasoning methods known as fuzzy logic can be used. A fuzzy arithmetic approach has also been proposed and implemented using a software tool (TDEIA).

Follow-up

At the end of the project, an audit evaluates the accuracy of the EIA by comparing actual to predicted impacts. The objective is to make future EIAs more valid and effective. Two primary considerations are:

·         Scientific – to examine the accuracy of predictions and explain errors

·         Management – to assess the success of mitigation in reducing impacts

Audits can be performed either as a rigorous assessment of the null hypothesis or with a simpler approach comparing what actually occurred against the predictions in the EIA document.

After an EIA, the precautionary and polluter pays principles may be applied to decide whether to reject, modify or require strict liability or insurance coverage to a project, based on predicted harms.

The Hydropower Sustainability Assessment Protocol is a sector specific method for checking the quality of Environmental and Social assessments and management plans.

The Ministry of Environment, Forests and Climate Change (MoEFCC) of India has been in a great effort in Environmental Impact Assessment in India.

The main laws in action are the Water Act(1974), the Indian Wildlife (Protection) Act (1972), the Air (Prevention and Control of Pollution) Act (1981) and the Environment (Protection) Act (1986),Biological Diversity Act(2002). The responsible body for this is the Central Pollution Control Board. Environmental Impact Assessment (EIA) studies need a significant amount of primary and secondary environmental data. Primary data are those collected in the field to define the status of the environment (like air quality data, water quality data etc.). Secondary data are those collected over the years that can be used to understand the existing environmental scenario of the study area. The environmental impact assessment (EIA) studies are conducted over a short period of time and therefore the understanding of the environmental trends, based on a few months of primary data, has limitations. Ideally, the primary data must be considered along with the secondary data for complete understanding of the existing environmental status of the area. In many EIA studies, the secondary data needs could be as high as 80% of the total data requirement. EIC is the repository of one stop secondary data source for environmental impact assessment in India.

The Environmental Impact Assessment (EIA) experience in India indicates that the lack of timely availability of reliable and authentic environmental data has been a major bottle neck in achieving the full benefits of EIA. The environment being a multi-disciplinary subject, a multitude of agencies are involved in collection of environmental data. However, no single organization in India tracks available data from these agencies and makes it available in one place in a form required by environmental impact assessment practitioners. Further, environmental data is not available in enhanced forms that improve the quality of the EIA. This makes it harder and more time-consuming to generate environmental impact assessments and receive timely environmental clearances from regulators. With this background, the Environmental Information Centre (EIC) has been set up to serve as a professionally managed clearing house of environmental information that can be used by MoEF, project proponents, consultants, NGOs and other stakeholders involved in the process of environmental impact assessment in India. EIC caters to the need of creating and disseminating of organized environmental data for various developmental initiatives all over the country.

EIC stores data in GIS format and makes it available to all environmental impact assessment studies and to EIA stakeholders in a cost effective and timely manner. So that we can manage that in different proportions such as remedy measures etc.

The National Environmental Policy Act of 1969 (NEPA), enacted in 1970, established a policy of environmental impact assessment for federal agency actions, federally funded activities or federally permitted/licensed activities that in the U. S. is termed "environmental review" or simply "the NEPA process." The law also created the Council on Environmental Quality, which promulgated regulations to codify the law's requirements. Under United States environmental law an Environmental Assessment (EA) is compiled to determine the need for an Environmental Impact Statement (EIS). Federal or federalized actions expected to subject or be subject to significant environmental impacts will publish a Notice of Intent to Prepare an EIS as soon as significance is known. Certain actions of federal agencies must be preceded by the NEPA process. Contrary to a widespread misconception, NEPA does not prohibit the federal government or its licensees/permittees from harming the environment, nor does it specify any penalty if an environmental impact assessment turns out to be inaccurate, intentionally or otherwise. NEPA requires that plausible statements as to the prospective impacts be disclosed in advance. The purpose of NEPA process is to ensure that the decision maker is fully informed of the environmental aspects and consequences prior to making the final decision.

Environmental assessment

An environmental assessment (EA) is an environmental analysis prepared pursuant to the National Environmental Policy Act to determine whether a federal action would significantly affect the environment and thus require a more detailed Environmental Impact Statement (EIS). The certified release of an Environmental Assessment results in either a Finding of No Significant Impact (FONSI) or an EIS.

The Council on Environmental Quality (CEQ), which oversees the administration of NEPA, issued regulations for implementing the NEPA in 1979. Eccleston reports that the NEPA regulations barely mention preparation of EAs. This is because the EA was originally intended to be a simple document used in relatively rare instances where an agency was not sure if the potential significance of an action would be sufficient to trigger preparation of an EIS. But today, because EISs are so much longer and complicated to prepare, federal agencies are going to great effort to avoid preparing EISs by using EAs, even in cases where the use of EAs may be inappropriate. The ratio of EAs that are being issued compared to EISs is about 100 to 1.

Likewise, even the preparation of an accurate EA is viewed today as an onerous burden by many entities responsible for the environmental review of a proposal. Federal agencies have responded by streamlining their regulations that implement NEPA environmental review, by defining categories of projects that by their well understood nature may be safely excluded from review under NEPA, and by drawing up lists of project types that have negligible material impact upon the environment and can thus be exempted.

Content

The Environmental Assessment is a concise public document prepared by the federal action agency that serves to:

1.  briefly provide sufficient evidence and analysis for determining whether to prepare an EIS or a Finding of No Significant Impact (FONSI)

2.  Demonstrate compliance with the act when no EIS is required

3.  facilitate the preparation of an EIS when a FONSI cannot be demonstrated

The Environmental Assessment includes a brief discussion of the purpose and need of the proposal and of its alternatives as required by NEPA 102(2)(E), and of the human environmental impacts resulting from and occurring to the proposed actions and alternatives considered practicable, plus a listing of studies conducted and agencies and stakeholders consulted to reach these conclusions. The action agency must approve an EA before it is made available to the public. The EA is made public through notices of availability by local, state, or regional clearing houses, often triggered by the purchase of a public notice advertisement in a newspaper of general circulation in the proposed activity area.

Structure

The structure of a generic Environmental Assessment is as follows:

1.  Summary

2.  Introduction

·         Background

·         Purpose and Need for Action

·         Proposed Action

·         Decision Framework

·         Public Involvement

·         Issues

3.  Alternatives, including the Proposed Action

·         Alternatives

·         Mitigation Common to All Alternatives

·         Comparison of Alternatives

4.  Environmental Consequences

5.  Consultation and Coordination

Procedure

The EA becomes a draft public document when notice of it is published, usually in a newspaper of general circulation in the area affected by the proposal. There is a 15-day review period required for an Environmental Assessment (30 days if exceptional circumstances) while the document is made available for public commentary, and a similar time for any objection to improper process. Commenting on the Draft EA is typically done in writing or email, submitted to the lead action agency as published in the notice of availability. An EA does not require a public hearing for verbal comments. Following the mandated public comment period, the lead action agency responds to any comments, and certifies either a FONSI or a Notice of Intent (NOI) to prepare an EIS in its public environmental review record. The preparation of an EIS then generates a similar but more lengthy, involved and expensive process.

Environmental impact statement

The adequacy of an environmental impact statement (EIS) can be challenged in federal court. Major proposed projects have been blocked because of an agency's failure to prepare an acceptable EIS. One prominent example was the Westway landfill and highway development in and along the Hudson Riverin New York City. Another prominent case involved the Sierra Club suing the Nevada Department of Transportation over its denial of the club's request to issue a supplemental EIS addressing air emissions of particulate matter and hazardous air pollutants in the case of widening U.S. Route 95 through Las Vegas. The case reached the United States Court of Appeals for the Ninth Circuit, which led to construction on the highway being halted until the court's final decision. The case was settled prior to the court's final decision.

Several state governments that have adopted "little NEPAs," state laws imposing EIS requirements for particular state actions. Some of those state laws such as the California Environmental Quality Act refer to the required environmental impact study as an environmental impact report.

This variety of state requirements produces voluminous data not just upon impacts of individual projects, but also in insufficiently researched scientific domains. For example, in a seemingly routine Environmental Impact Report for the city of Monterey, California, information came to light that led to the official federal endangered species listing of Hickman's potentilla, a rare coastal wildflower.

Transboundary application

Environmental threats do not respect national borders. International pollution can have detrimental effects on the atmosphere, oceans, rivers, aquifers, farmland, the weather and biodiversity. Global climate change is transnational. Specific pollution threats include acid rain, radioactive contamination, debris in outer space, stratospheric ozone depletion and toxic oil spills. The Chernobyl disaster, precipitated by a nuclear accident on April 26, 1986, is a stark reminder of the devastating effects of transboundary nuclear pollution.

Environmental protection is inherently a cross-border issue and has led to the creation of transnational regulation via multilateral and bilateral treaties. The United Nations Conference on the Human Environment (UNCHE or Stockholm Conference) held in Stockholm in 1972 and the United Nations Conference on the Environment and Development (UNCED or Rio Summit, Rio Conference, or Earth Summit) held in Rio de Janeiro in 1992 were key in the creation of about 1,000 international instruments that include at least some provisions related to the environment and its protection.

The United Nations Economic Commission for Europe's Convention on Environmental Impact Assessment in a Transboundary Context was negotiated to provide an international legal framework for transboundary EIA.

However, as there is no universal legislature or administration with a comprehensive mandate, most international treaties exist parallel to one another and are further developed without the benefit of consideration being given to potential conflicts with other agreements. There is also the issue of international enforcement. This has led to duplications and failures, in part due to an inability to enforce agreements. An example is the failure of many international fisheries regimes to restrict harvesting practises. Application shall be achieved by the willing of counties authorities. / Aphro10

Criticism

 EIA is used as a decision aiding tool rather than decision making tool. There is growing dissent about them as their influence on decisions is limited. Improved training for practitioners, guidance on best practice and continuing research have all been proposed.

EIAs have been criticized for excessively limiting their scope in space and time. No accepted procedure exists for determining such boundaries. The boundary refers to ‘the spatial and temporal boundary of the proposal’s effects’. This boundary is determined by the applicant and the lead assessor, but in practice, almost all EIAs address only direct and immediate on-site effects.

Development causes both direct and indirect effects. Consumption of goods and services, production, use and disposal of building materials and machinery, additional land use for activities of manufacturing and services, mining and refining, etc., all have environmental impacts. The indirect effects of development can be much higher than the direct effects examined by an EIA. Proposals such as airports or shipyards cause wide-ranging national and international effects, which should be covered in EIAs.

Broadening the scope of EIA can benefit the conservation of threatened species. Instead of concentrating on the project site, some EIAs employed a habitat-based approach that focused on much broader relationships among humans and the environment. As a result, alternatives that reduce the negative effects to the population of whole species, rather than local subpopulations, can be assessed.

Little attention is given to the systematic identification and assessment of uncertainties in environmental studies which is critical in situations where uncertainty cannot be easily reduced by doing more research.

Need to consider uncertainty at all stages of the decision-making process. In such a way decisions can be made with confidence or known uncertainty. These proposals are justified on data that shows that environmental assessments fail to predict accurately the impacts observed.

Eevidence of the intrinsic uncertainty attached to EIAs predictions from a number of case studies worldwide. The gathered evidence consisted of comparisons between predictions in EIAs and the impacts measured during, or following project implementation. In explaining this trend, Highlighted major causes are project changes, modelling errors, errors in data and assumptions taken and bias introduced by people in the projects analyzed.

Environmental management system (EMS)

Environmental management system (EMS) refers to the management of an organization's environmental programs in a comprehensive, systematic, planned and documented manner. It includes the organizational structure, planning and resources for developing, implementing and maintaining policy for environmental protection.

More formally, EMS is "a system and database which integrates procedures and processes for training of personnel, monitoring, summarizing, and reporting of specialized environmental performance information to internal and external stakeholders of a firm".

The most widely used standard on which an EMS is based is International Organization for Standardization (ISO) 2004. Alternatives include the EMAS.

An environmental management information system (EMIS) or Environmental Data Management System (EDMS) is an information technology solution for tracking environmental data for a company as part of their overall environmental management system.

Goals

The goals of EMS are to increase compliance and reduce waste:

·         Compliance is the act of reaching and maintaining minimal legal standards. By not being compliant, companies may face fines, government intervention or may not be able to operate.

·         Waste reduction goes beyond compliance to reduce environmental impact. The EMS helps to develop, implement, manage, coordinate and monitor environmental policies. Waste reduction begins at the design phase through pollution prevention and waste minimization. At the end of the life cycle, waste is reduced by recycling.

To meet these goals, the selection of environmental management systems is typically subject to a certain set of criteria: a proven capability to handle high frequency data, high performance indicators, transparent handling and processing of data, powerful calculation engine, customised factor handling, multiple integration capabilities, automation of workflows and QA processes and in-depth, flexible reporting.

Features

An environmental management system (EMS):

·         Serves as a tool, or process, to improve environmental performance and information mainly "design, pollution control and waste minimization, training, reporting to top management, and the setting of goals"

·         Provides a systematic way of managing an organization’s environmental affairs

·         Is the aspect of the organization’s overall management structure that addresses immediate and long-term impacts of its products, services and processes on the environment. EMS assists with planning, controlling and monitoring policies in an organization.

·         Gives order and consistency for organizations to address environmental concerns through the allocation of resources, assignment of responsibility and ongoing evaluation of practices, procedures and processes

·         Creates environmental buy-in from management and employees and assigns accountability and responsibility.

·         Sets framework for training to achieve objectives and desired performance.

·         Helps understand legislative requirements to better determine a product or service's impact, significance, priorities and objectives.

·         Focuses on continual improvement of the system and a way to implement policies and objectives to meet a desired result. This also helps with reviewing and auditing the EMS to find future opportunities.

·         Encourages contractors and suppliers to establish their own EMS.

·         Facilitates e-reporting to federal, state and provincial government environmental agencies through direct upload.

EMS Model

The PDCA cycle

An EMS follows a Plan-Do-Check-Act, or PDCA, Cycle. The diagram shows the process of first developing an environmental policy, planning the EMS, and then implementing it. The process also includes checking the system and acting on it. The model is continuous because an EMS is a process of continual improvement in which an organization is constantly reviewing and revising the system.

This is a model that can be used by a wide range of organizations — from manufacturing facilities to service industries to government agencies.

Accreditation

Environmental Data Management Systems (EDMS) can be accredited under the UK Environment Agency's Monitoring Certification Scheme (MCERTS) for Performance standards and test procedures.

Other meanings

An EMS can also be classified as

·         a system which monitors, tracks and reports emissions information, particularly with respect to the oil and gas industry. EMSs are becoming web-based in response to the EPA's mandated greenhouse gas (GHG) reporting rule, which allows for reporting GHG emissions information via the internet.

·         a centrally controlled and often automated network of devices (now frequently wireless using z-wave and zigbee technologies) used to control the internal environment of a building. Such a system namely acts as an interface between end user and energy (gas/electricity) consumption.

Examples

·         EtQ workflow-based environmental management software

·         NEMS environmental management suite

·         Emisoft's environmental management, reporting and compliance platform

·         Medgate environmental management software

·         MonitorPro environmental data management system

·         EsDat environmental data management system

·         Enviance regulatory compliance system

·         ERA Environmental's environmental management system

 

Life Cycle Assessment (LCA), ISO 9000, ISO 14000

Life-cycle assessment (LCA, also known as life-cycle analysisecobalance, and cradle-to-grave analysis) is a technique to assess environmental impacts associated with all the stages of a product's life from raw material extraction through materials processing, manufacture, distribution, use, repair and maintenance, and disposal or recycling. Designers use this process to help critique their products. LCAs can help avoid a narrow outlook on environmental concerns by:

·         Compiling an inventory of relevant energy and material inputs and environmental releases;

·         Evaluating the potential impacts associated with identified inputs and releases;

·         Interpreting the results to help make a more informed decision

The goal of LCA is to compare the full range of environmental effects assignable to products and services by quantifying all inputs and outputs of material flows and assessing how these material flows affect the environment. This information is used to improve processes, support policy and provide a sound basis for informed decisions.

The term life cycle refers to the notion that a fair, holistic assessment requires the assessment of raw-material production, manufacture, distribution, use and disposal including all intervening transportation steps necessary or caused by the product's existence.

There are two main types of LCA. Attributional LCAs seek to establish (or attribute) the burdens associated with the production and use of a product, or with a specific service or process, at a point in time (typically the recent past). Consequential LCAs seek to identify the environmental consequences of a decision or a proposed change in a system under study (oriented to the future), which means that market and economic implications of a decision may have to be taken into account. Social LCA is under development as a different approach to life cycle thinking intended to assess social implications or potential impacts. Social LCA should be considered as an approach that is complementary to environmental LCA.

The procedures of life cycle assessment (LCA) are part of the ISO 14000 environmental management standards: in ISO 14040:2006 and 14044:2006. (ISO 14044 replaced earlier versions of ISO 14041 to ISO 14043.) GHG product life cycle assessments can also comply with specifications such as PAS 2050 and the GHG Protocol Life Cycle Accounting and Reporting Standard.

LCA uses

LCA is mostly used to support business strategy and R&D, as input to product or process design, in education and for labeling or product declarations. LCA will be continuously integrated into the built environment as tools such as the European ENSLIC Building project guidelines for buildings or developed and implemented, which provide practitioners guidance on methods to implement LCI data into the planning and design process.

Major corporations all over the world are either undertaking LCA in house or commissioning studies, while governments support the development of national databases to support LCA. Of particular note is the growing use of LCA for ISO Type III labels called Environmental Product Declarations, defined as "quantified environmental data for a product with pre-set categories of parameters based on the ISO 14040 series of standards, but not excluding additional environmental information". These third-party certified LCA-based labels provide an increasingly important basis for assessing the relative environmental merits of competing products. Third-party certification plays a major role in today's industry. Independent certification can show a company's dedication to safer and environmental friendlier products to customers and NGOs.

LCA also has major roles in environmental impact assessment, integrated waste management and pollution studies. A recent study evaluated the LCA of a laboratory scale plant for oxygen enriched air production coupled with its economic evaluation in an holistic eco-design standpoint. LCA has also been used to assess the environmental impacts of pavement maintenance, repair, and rehabilitation activities .

Variants

Cradle-to-grave

Cradle-to-grave is the full Life Cycle Assessment from resource extraction ('cradle') to use phase and disposal phase ('grave'). For example, trees produce paper, which can be recycled into low-energy production cellulose (fiberised paper) insulation, then used as an energy-saving device in the ceiling of a home for 40 years, saving 2,000 times the fossil-fuel energy used in its production. After 40 years the cellulose fibers are replaced and the old fibers are disposed of, possibly incinerated. All inputs and outputs are considered for all the phases of the life cycle.

Cradle-to-gate

Cradle-to-gate is an assessment of a partial product life cycle from resource extraction (cradle) to the factory gate (i.e., before it is transported to the consumer). The use phase and disposal phase of the product are omitted in this case. Cradle-to-gate assessments are sometimes the basis for environmental product declarations (EPD) termed business-to-business EDPs. One of the significant uses of the cradle-to-gate approach compiles the life cycle inventory (LCI) using cradle-to-gate. This allows the LCA to collect all of the impacts leading up to resources being purchased by the facility. They can then add the steps involved in their transport to plant and manufacture process to more easily produce their own cradle-to-gate values for their products.

Cradle-to-cradle or closed loop production

Cradle-to-cradle is a specific kind of cradle-to-grave assessment, where the end-of-life disposal step for the product is a recycling process. It is a method used to minimize the environmental impact of products by employing sustainable production, operation, and disposal practices and aims to incorporate social responsibility into product development. From the recycling process originate new, identical products (e.g., asphalt pavement from discarded asphalt pavement, glass bottles from collected glass bottles), or different products (e.g., glass wool insulation from collected glass bottles).

Allocation of burden for products in open loop production systems presents considerable challenges for LCA. Various methods, such as the avoided burden approach have been proposed to deal with the issues involved.

Gate-to-gate

Gate-to-gate is a partial LCA looking at only one value-added process in the entire production chain. Gate-to-gate modules may also later be linked in their appropriate production chain to form a complete cradle-to-gate evaluation.

Well-to-wheel

Well-to-wheel is the specific LCA used for transport fuels and vehicles. The analysis is often broken down into stages entitled "well-to-station", or "well-to-tank", and "station-to-wheel" or "tank-to-wheel", or "plug-to-wheel". The first stage, which incorporates the feedstock or fuel production and processing and fuel delivery or energy transmission, and is called the "upstream" stage, while the stage that deals with vehicle operation itself is sometimes called the "downstream" stage. The well-to-wheel analysis is commonly used to assess total energy consumption, or the energy conversion efficiency and emissions impact of marine vessels, aircraft and motor vehicles, including their carbon footprint, and the fuels used in each of these transport modes. WtW analysis is useful for reflecting the different efficiencies and emissions of energy technologies and fuels at both the upstream and downstream stages, giving a more complete picture of real emissions.

The well-to-wheel variant has a significant input on a model developed by the Argonne National Laboratory. The Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model was developed to evaluate the impacts of new fuels and vehicle technologies. The model evaluates the impacts of fuel use using a well-to-wheel evaluation while a traditional cradle-to-grave approach is used to determine the impacts from the vehicle itself. The model reports energy use, greenhouse gas emissions, and six additional pollutants: volatile organic compounds (VOCs), carbon monoxide (CO), nitrogen oxide (NOx), particulate matter with size smaller than 10 micrometre (PM10), particulate matter with size smaller than 2.5 micrometre (PM2.5), and sulfur oxides (SOx).

Quantitative values of greenhouse gas emissions calculated with the WTW or with the LCA method can differ, since the LCA is considering more emission sources. In example, while assessing the GHG emissions of a Battery Electric Vehicle in comparison with a conventional internal combustion engine vehicle, the WTW (accounting only the GHG for manufacturing the fuels) finds out that an electric vehicle can save the 50-60% of GHG , while an hybrid LCA-WTW method, considering also the GHG due to the manufacturing and the end of life of the battery gives GHG emission savings 10-13% lower, compared to the WTW. 

Economic input–output life cycle assessment

Economic input–output LCA (EIOLCA) involves use of aggregate sector-level data on how much environmental impact can be attributed to each sector of the economy and how much each sector purchases from other sectors. Such analysis can account for long chains (for example, building an automobile requires energy, but producing energy requires vehicles, and building those vehicles requires energy, etc.), which somewhat alleviates the scoping problem of process LCA; however, EIOLCA relies on sector-level averages that may or may not be representative of the specific subset of the sector relevant to a particular product and therefore is not suitable for evaluating the environmental impacts of products. Additionally the translation of economic quantities into environmental impacts is not validated.

Ecologically based LCA

While a conventional LCA uses many of the same approaches and strategies as an Eco-LCA, the latter considers a much broader range of ecological impacts. It was designed to provide a guide to wise management of human activities by understanding the direct and indirect impacts on ecological resources and surrounding ecosystems. Developed by Ohio State University Center for resilience, Eco-LCA is a methodology that quantitatively takes into account regulating and supporting services during the life cycle of economic goods and products. In this approach services are categorized in four main groups: supporting, regulating, provisioning and cultural services.

Energy based LCA

Energy of a system is the maximum useful work possible during a process that brings the system into equilibrium with a heat reservoir. Wall  clearly states the relation between exergy analysis and resource accounting. This intuition confirmed by DeWulf  and Sciubba  lead to Exergo-economic accounting  and to methods specifically dedicated to LCA such as Exegetic material input per unit of service (EMIPS). The concept of material input per unit of service (MIPS) is quantified in terms of the second law of thermodynamics, allowing the calculation of both resource input and service output in energy terms. This energetic material input per unit of service (EMIPS) has been elaborated for transport technology. The service not only takes into account the total mass to be transported and the total distance, but also the mass per single transport and the delivery time.

Life cycle energy analysis

Life cycle energy analysis (LCEA) is an approach in which all energy inputs to a product are accounted for, not only direct energy inputs during manufacture, but also all energy inputs needed to produce components, materials and services needed for the manufacturing process. An earlier term for the approach was energy analysis. With LCEA, the total life cycle energy input is established.

Energy production

It is recognized that much energy is lost in the production of energy commodities themselves, such as nuclear energy, photovoltaic electricity or high-quality petroleum products. Net energy content is the energy content of the product minus energy input used during extraction and conversion, directly or indirectly. A controversial early result of LCEA claimed that manufacturing solar cells requires more energy than can be recovered in using the solar cell. The result was refuted. Another new concept that flows from life cycle assessments is Energy Cannibalism. Energy Cannibalism refers to an effect where rapid growth of an entire energy-intensive industry creates a need for energy that uses (or cannibalizes) the energy of existing power plants. Thus during rapid growth the industry as a whole produces no energy because new energy is used to fuel the embodied energy of future power plants. Work has been undertaken in the UK to determine the life cycle energy (alongside full LCA) impacts of a number of renewable technologies.

Energy recovery

If materials are incinerated during the disposal process, the energy released during burning can be harnessed and used for electricity production. This provides a low-impact energy source, especially when compared with coal and natural gas While incineration produces more greenhouse gas emissions than landfilling, the waste plants are well-fitted with filters to minimize this negative impact. A recent study comparing energy consumption and greenhouse gas emissions from landfilling (without energy recovery) against incineration (with energy recovery) found incineration to be superior in all cases except for when landfill gas is recovered for electricity production.

The ISO 9000 family of quality management systems standards is designed to help organizations ensure that they meet the needs of customers and other stakeholders while meeting statutory and regulatory requirements related to a product or service. ISO 9000 deals with the fundamentals of quality management systems, including the seven quality management principles upon which the family of standards is based.  ISO 9001 deals with the requirements that organizations wishing to meet the standard must fulfill.

Third-party certification bodies provide independent confirmation that organizations meet the requirements of ISO 9001. Over one million organizations worldwide are independently certified, making ISO 9001 one of the most widely used management tools in the world today. However, the ISO certification process has been criticized as being wasteful and not being useful for all organizations

ISO 9000 was first published in 1987 by ISO (International Organization for Standardization). It was based on the BS 5750 series of standards from BSI that were proposed to ISO in 1979. However, its history can be traced back some twenty years before that, to the publication of government procurement standards, such as the United States Department of Defense MIL-Q-9858 standard in 1959, and the UK's Def Stan 05-21 and 05-24. Large organizations which supplied government procurement agencies often had to comply with a variety of quality assurance requirements for each contract awarded which led the defence industry to adopt mutual recognition of NATO AQAP, MIL-Q and Def Stan standards. Eventually, ISO 9000 was adopted as a suitable option, instead of forcing contractors to adopt multiple - and often similar - requirements.

Reasons for use

The global adoption of ISO 9001 may be attributable to a number of factors. In the early days, the ISO 9001 (9002 and 9003) requirements were intended to be used by procuring organizations, as the basis of contractual arrangements with their suppliers. This helped reduce the need for "supplier development" by establishing basic requirements for a supplier to assure product quality. The ISO 9001 requirements could be tailored to meet specific contractual situations, depending on the complexity of product, business type (design responsibility, manufacture only, distribution, servicing etc.) and risk to the procurer. If a chosen supplier was weak on the controls of their measurement equipment (calibration), and hence QC/inspection results, that specific requirement would be invoked in the contract. The adoption of a single Quality Assurance requirement also lead to cost savings throughout the supply chain by reducing the administrative burden of maintaining multiple sets of quality manuals and procedures.

A few years later, the UK Government took steps to improve national competitiveness following publication of cmd 8621, and Third Party Certification of Quality Management Systems was born, under the auspices of the National Accreditation Council of Certification Bodies (NACCB) which has become the United Kingdom Accreditation Service (UKAS) .

ISO 9000 series Quality Management Principles

The ISO 9000 series are based on seven quality management principles (QMP)

The seven quality management principles are:

Principle 1 – Customer focus

Organizations depend on their customers and therefore should understand current and future customer needs, should meet customer requirements and strive to exceed customer expectations.

Principle 2 – Leadership

Leaders establish unity of purpose and direction of the organization. They should create and maintain the internal environment in which people can become fully involved in achieving the organization's objectives.

Principle 3 – Engagement of people

People at all levels are the essence of an organization and their full involvement enables their abilities to be used for the organization's benefit.

Principle 4 – Process approach

A desired result is achieved more efficiently when activities and related resources are managed as a process.

Principle 5 – Improvement

Improvement of the organization's overall performance should be a permanent objective of the organization.

Principle 6 – Evidence-based decision making

Effective decisions are based on the analysis of data and information.

Principle 7 – Relationship management

An organization and its external providers (suppliers, contractors, service providers) are interdependent and a mutually beneficial relationship enhances the ability of both to create value.

Evolution of ISO 9000 standards

The ISO 9000 standard is continually being revised by standing technical committees and advisory groups, who receive feedback from those professionals who are implementing the standard.

1987 version

ISO 9000:1987 had the same structure as the UK Standard BS 5750, with three "models" for quality management systems, the selection of which was based on the scope of activities of the organization:

·ISO 9001:1987 Model for quality assurance in design, development, production, installation, and servicing was for companies and organizations whose activities included the creation of new products.

·ISO 9002:1987 Model for quality assurance in production, installation, and servicing had basically the same material as ISO 9001 but without covering the creation of new products.

·ISO 9003:1987 Model for quality assurance in final inspection and test covered only the final inspection of finished product, with no concern for how the product was produced.

ISO 9000:1987 was also influenced by existing U.S. and other Defense Standards ("MIL SPECS"), and so was well-suited to manufacturing. The emphasis tended to be placed on conformance with procedures rather than the overall process of management, which was likely the actual intent.

1994 version

ISO 9000:1994 emphasized quality assurance via preventive actions, instead of just checking final product, and continued to require evidence of compliance with documented procedures. As with the first edition, the down-side was that companies tended to implement its requirements by creating shelf-loads of procedure manuals, and becoming burdened with an ISO bureaucracy. In some companies, adapting and improving processes could actually be impeded by the quality system.

2000 version

ISO 9001:2000 replaced all three former standards of 1994 issue, ISO 9001ISO 9002 and ISO 9003. Design and development procedures were required only if a company does, in fact, engage in the creation of new products. The 2000 version sought to make a radical change in thinking by actually placing front and centre the concept of process management (the monitoring and optimisation of a company's tasks and activities, instead of just inspection of the final product). The 2000 version also demanded involvement by upper executives in order to integrate quality into the business system and avoid delegation of quality functions to junior administrators. Another goal was to improve effectiveness via process performance metrics: numerical measurement of the effectiveness of tasks and activities. Expectations of continual process improvement and tracking customer satisfaction were made explicit.

2008 version

ISO 9001:2008 in essence re-narrates ISO 9001:2000. The 2008 version only introduced clarifications to the existing requirements of ISO 9001:2000 and some changes intended to improve consistency with ISO 14001:2004. There were no new requirements. For example, in ISO 9001:2008, a quality management system being upgraded just needs to be checked to see if it is following the clarifications introduced in the amended version.

ISO 9001 is supplemented directly by two other standards of the family:

·                        ISO 9000:2005 "Quality management systems. Fundamentals and vocabulary"

·                        ISO 9004:2009 "Managing for the sustained success of an organization. A quality management approach"

Other standards, like ISO 19011 and the ISO 10000 series, may also be used for specific parts of the quality system.

Advantages

Proper quality management can improve business, often having a positive effect on investment, market share, sales growth, sales margins, competitive advantage, and avoidance of litigation. The quality principles in ISO 9000:2000 are also sound, "ISO 9000 guidelines provide a comprehensive model for quality management systems that can make any company competitive". Found benefits ranging from registration required to remain part of a supply base, better documentation, to cost benefits, and improved involvement and communication with management. 

ISO 9000 refers to a generic series of standards published by the ISO that provide quality assurance requirements and quality management guidance. ISO 9000 is a quality system standard, not a technical product standard. ... ISO 14000 refers to a series of standards on environmental management tools and systems.

ISO 14000 is a series of environmental management standards developed and published by the International Organization for Standardization ( ISO ) for organizations. The ISO 14000 standards provide a guideline or framework for organizations that need to systematize and improve their environmental management efforts.

ISO 14001 is an internationally agreed standard that sets out the requirements for an environmental management system. It helps organizations improve their environmental performance through more efficient use of resources and reduction of waste, gaining a competitive advantage and the trust of stakeholders.

Quality management: The Importance of ISO. ... Manufacturing sectors have adopted ISO 9000 for three reasons: the value of the standard, the sales and marketing advantage, and company requirements.

ISO 14000 is a family of standards related to environmental management that exists to help organizations (a) minimize how their operations (processes, etc.) negatively affect the environment (i.e. cause adverse changes to air, water, or land); (b) comply with applicable laws, regulations, and other environmentally oriented requirements; and (c) continually improve in the above.

ISO 14000 is similar to ISO 9000 quality management in that both pertain to the process of how a product is produced, rather than to the product itself. As with ISO 9001, certification is performed by third-party organizations rather than being awarded by ISO directly.

The requirements of ISO 14001 are an integral part of the European Union's Eco-Management and Audit Scheme (EMAS). EMAS's structure and material are more demanding, mainly concerning performance improvement, legal compliance, and reporting duties. The current version of ISO 14001 is ISO 14001:2015, which was published in September 2015.